|
| Design, manufacture and commissioned by Field International Limited |
|
| AOG fixtures & Tooling Designed, manufactured & installed by Field International Limited all within a 3 week period. |
 |
| Designed, manufactured,installed and commissioned at Airbus Chester by Field International Limited.
|